







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cover Fence Installation: The San Francisco Owner’s Guide
Cover fence installation in San Francisco typically runs $4,130 – $10,620, including the fence panels, posts, hardware, and labor. We stock Cover-compatible fence components at our San Francisco shop and can usually complete the installation within one to two days once materials are confirmed. Most San Francisco owners discover they need this service when a fence section starts leaning after winter storms, or when the existing posts have rotted at the base where fog moisture collects against the wood.

The written price comes before any work starts, and it includes the drop cloths we put down, the shoe covers at the door, and the photo of the clean-up before the crew leaves. That’s the Cedarwell Care Promise on every Cover fence installation we do in San Francisco.
Which Cover Models This Applies To

Cover produces modular fence systems in a handful of standard configurations, and the installation differences matter. The two most common Cover fence lines we install across San Francisco are the Cover Classic series, which uses 4×4 pressure-treated posts on 6-foot centers, and the Cover Horizon series, which moves to 6×6 posts on 8-foot centers for taller runs and windier exposures. You can identify which series you have by checking the sticker on the inside face of a post cap, or by measuring the distance between post centers with a tape measure. If it reads 72 inches, you have the Classic. If it reads 96, you have the Horizon.
One compatibility gotcha we see regularly in San Francisco: Cover changed its post bracket spacing in 2019, so panels from before that year will not seat cleanly on new posts without a shim kit. We keep those shim kits on the truck. On the OEM versus aftermarket question for Cover specifically, the rails and pickets are proprietary profiles, meaning generic big-box rails will leave visible gaps at the seams. We order Cover OEM rails and pickets for every Cover fence installation and use pressure-treated posts sourced locally so the post warranty is honored by the lumberyard, not lost in shipping.
Styles & brands we work with







Signs Your Cover Fence Installation Is Failing
- Leaning sections after a storm. In San Francisco’s Richmond and Sunset districts, saturated soil loosens post footings. If the fence leans more than a few degrees and doesn’t spring back, the post base has likely begun to rot below grade.
- Rails pulling away from the posts. Cover’s older bracket design used a single lag screw per rail end. After years of fog-season expansion and summer drying, that screw backs out and the rail drops, taking a row of pickets with it.
- Pickets cracked vertically down the center. This is almost always moisture-related. San Francisco’s marine layer keeps wood damp for months, and when a picket was milled with the heart center included, it splits as the wood dries unevenly.
- Post caps missing or warped. The cap is the first line of defense against water entering the post grain. Once a cap goes, the post soaks from the top down and fails within two or three winters.
- Gate dragging or refusing to latch. When the hinge post shifts even half an inch, the gate geometry changes and the latch no longer lines up. This is often the first symptom owners notice, long before the fence itself looks wrong.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For a full Cover fence installation in San Francisco, the $4,130 – $10,620 range is driven primarily by linear footage, post condition, access, and whether the old fence needs removal. A short 20-foot side yard replacement with fresh posts and new pickets will sit near the lower end. A long 60-plus-foot run with old concrete footings, rotted posts, and gate replacement will land at the higher end.
Every Cover fence installation quote includes the parts, the labor, removal and haul-away of the old fence, new concrete for the post footings, and the written price before any work starts. We do not add change orders once the crew arrives. The 365-Day Done Right Promise applies to the finished fence: if it is not done right, we make it right. Graham Stein walks the fence line with you before the quote is written and names every post, every rail, and every picket you are paying for.
DIY or Call Us?
Replacing a single picket or tightening a loose rail screw is something a San Francisco homeowner can handle with a drill and fifteen minutes. Checking post cap coverage before the rainy season is also a reasonable Saturday job. What we would not recommend is digging out set concrete footings on a hillside lot, especially in neighborhoods like Glen Park or Diamond Heights where the fence is holding back soil as much as it is marking a boundary. A post that lets go on a slope will take a section of yard with it.
If the post is rotted at the base or the fence has begun to lean, that is the moment to call. We will come out, look at the fence line, and give you a written price before anything gets scheduled. Call (831) 480-4497 and a live person will answer.
FAQs

A Cover fence with pressure-treated posts and proper post caps will last 15 to 20 years in San Francisco, though the marine layer means pickets facing the fog side will show weathering sooner than the sun side. The posts outlast the pickets, and many owners choose to re-skin the fence once around year 12 rather than replace the whole structure. Call (831) 480-4497 and we’ll walk your fence line to give you an honest read on how many years are left.
Yes, if the posts are sound and the failure is limited to rails, pickets, or the gate assembly. We repair far more Cover fences in San Francisco than we replace. We stock Cover OEM rails and pickets, plus the shim kits needed for pre-2019 models, so a repair is usually one visit. For an exact quote on your fence, call (831) 480-4497; estimates are free.
Most Cover fence installations in San Francisco take one to two days once materials are in hand. Post-setting day is day one, and the crew returns after the concrete has cured enough to hang rails and pickets. We work around school hours and nap schedules where we can, and quiet tools come out during those windows.
We keep Cover OEM rails, pickets, post caps, and bracket shim kits in stock at our San Francisco shop for the most common sizes, so most repair jobs don’t wait on a shipment. For full installations we order panels to the exact linear footage we measured. Either way, the written price comes first. Call (831) 480-4497 to schedule a free estimate.
Written by Graham Stein, Owner, Elmstead Remodeling San Francisco at Elmstead Remodeling San Francisco, serving San Francisco and nearby areas.


